woensdag, oktober 19, 2005

Day 2

We're both pretty amazed at the progress we're making. The living room wall is coming along.



We pulled up the carpets from all of the rooms except the ground floor, the first floor (second floor for Americans) hallway, and the steps to the second floor.

The rooms above and below are what will be the master bedroom.

The steps between the first and second floors are free of carpet now.
The second floor looks much cleaner with the carpets removed from the study

and the 2nd floor hall.

Tomorrow we'll finish removing the brick wall in the living room and pull the rest of the carpet.